Skip to main content

IBM Systems >  BladeCenter >  Resources > 

IBM System x and BladeCenter Power Configurator

Calculate your energy savings with the System x or IBM BladeCenter Power Configurator


Energy costs are top of mind in IT today. In fact, it is estimated that each year companies pay a significant part of the purchase price of a system on powering, cooling and housing that system.

Discover the energy savings IBM System x™ and BladeCenter® servers can bring to your business. Take the power challenge using the IBM Power Configurator today.

Let's get started.

Download now (5.55 MB, installer Release 4.4.2.55 - Mar 21, 2008)
Download README.TXT
(3.51 KB)


Analyst Quote

Robert Francis Group
"Even without factoring in the need for additional systems, due to need for faster processors and the reality of higher energy prices/watt, Robert Francis Group believes power will be the number one issue for most large company IT executives to address in the next 2-4 years. Ignoring this issue will NOT be an option. Power consideration must be incorporated into data center planning. This includes close cooperation with facilities management, intelligent reduction of unneeded applications, systems, and infrastructure, and re-evaluating system design with an emphasis on power efficiency as a fundamental design criterion".


We’re here to help
Woman

Easy ways to get the answers you need.

Call us at
1-800-IBM-4YOU
Request a quote

or call us at
1-866-883-8901
Mention code:
106BC87W


IBM BladeCenter
IBM BladeCenter

The smartest way to optimize your IT.

Learn more