Discover the energy savings IBM System x™, BladeCenter®, and Flex System servers can bring to your business. Take the power challenge using the IBM Power Configurator today.
Let's get started.
IBM Power Configurator v5.0
IBM Power Configurator v4.6.14 for legacy systems
Links to other power resources
Analyst Quote
Robert Frances Group
"Even without factoring in the need for additional systems, due to need for faster processors and the reality of higher energy prices/watt, Robert Frances Group believes power will be the number one issue for most large company IT executives to address in the next 2-4 years. Ignoring this issue will NOT be an option. Power consideration must be incorporated into data center planning. This includes close cooperation with facilities management, intelligent reduction of unneeded applications, systems, and infrastructure, and re-evaluating system design with an emphasis on power efficiency as a fundamental design criterion".
Contact IBM
- Email IBM
- Find a Business Partner
-
Call IBM: 1-866-883-8901
Priority code: 101J313W