| |
IBM BladeCenter H requires nearly 10% less power than the equivalently configured HP BladeSystem c7000. You really can go green and save with IBM BladeCenter® systems.
Designed from the ground up to help dramatically improve power utilization and reduce energy costs without sacrificing performance, IBM BladeCenter systems are the RIGHT choice for energy efficiency.
| |
Edison Group, an independent technology analysis and consulting firm, compared the power consumption of IBM BladeCenter with a comparable BladeSystem blade server configuration from HP. Edison Group found that IBM BladeCenter H requires nearly 10% less power than the equivalently configured HP BladeSystem c7000. Extrapolated over 224 servers and with an energy cost of 9.4 cents per kilowatt-hour, this can save you up to $12,000 per year.
| |
|