Running SAP NetWeaver® BPM on IBM POWER7® for High Volume Human Centric Scenarios
Document Author:
Walter Orb
Document ID:
WP102045
Doc. Organization:
Systems and Technology Group
Document Revised:
12/27/2011
Product(s) covered:
AIX; DB2 for AIX; POWER7; Power 750
Abstract: In this case study IBM and SAP demonstrate that SAP NetWeaver BPM 7.2 is able to run business-critical business processes in a complex system landscape for human centric scenarios under high volume requirements. The document outlines the maximum achieved throughput for a typical three-step approval. On the provided platform the case study demonstrates the scalability of the software system and provides detailed system landscape and configuration information.
Classification:
Hardware; Software; Solutions
Category:
Performance
Solution(s):
ISV Applications
ISV(s):
SAP
Platform(s):
IBM Power Systems
S/W Pillar(s):
Information Management
O/S:
AIX
Keywords:
SAPBPM Business Process Management POWER7 POWER Performance
The Techdocs Library
Is this your first visit to Techdocs (the Technical Sales Library)?