Skip to main content

Techdocs Library > Presentations & Tools >

Server Time Protocol (STP) Recovery Considerations



Document Author:
Additional Author(s):

Gregory Hutchison
Noshir Dhondy


Document ID:

PRS2233


Doc. Organization:

Advanced Technical Sales


Document Revised:

12/08/2010


Product(s) covered:

GDPS; z9-109; z9 BC; z9 EC; zSeries 890; zSeries 990; zSeries; z/OS; z/OS.e







Abstract: These presentations introduces you to STP Recovery concepts, including recovery scenario examples.
There are three presentations.
1. STP Recovery Considerations- all STP-only CTN types - December 12 2010.pdf
This one includes all types CTNs (i.e. Mixed CTN, STP-only with a BTS, STP-only with a BTS and an Arbiter).

2. STP Recovery Considerations- 2 server CTN - December 12 2010.pdf
This presentation covers an STP-only CTN with only a PTS/CTS and BTS assigned.

3. STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.pdf
This presentation covers an STP-only CTN with all three roles assigned (PTS/CTS, BTS and Arbiter).
This presentation also covers some GDPS and PPRC considerations.

1. STP Recovery Considerations- all STP-only CTN types - December 12 2010.pdf
STP Recovery Considerations- all STP-only CTN types - December 12 2010.ppt STP Recovery Considerations- all STP-only CTN types - December 12 2010.ppt STP Recovery Considerations- all STP-only CTN types - December 12 2010.pdf STP Recovery Considerations- all STP-only CTN types - December 12 2010.pdf


2. STP Recovery Considerations- 2 server CTN - December 12 2010.pdf
STP Recovery Considerations- 2 server CTN - December 12 2010.ppt STP Recovery Considerations- 2 server CTN - December 12 2010.ppt STP Recovery Considerations- 2 server CTN - December 12 2010.pdf STP Recovery Considerations- 2 server CTN - December 12 2010.pdf



3. STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.pdf
STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.ppt STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.ppt STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.pdf STP Recovery Considerations- Triad CTN with GDPS content - December 12 2010.pdf



Classification:

Hardware

Category:

Planning and Design




Platform(s):

IBM System z Family

S/W Pillar(s):

IBM System z Software

:


Keywords:

STP, Server Time Protocol, ETR

The Techdocs Library
Is this your first visit to Techdocs (the Technical Sales Library)?

Learn more


Techdocs QuickSearch

: