Section 1 -
Planning - Given that the software
source is available, obtain the appropriate versions of DB2, WebSphere
Application Server (WAS), IBM HTTP Server (IHS) and IBM Tivoli License Manager
(ITLM) so that all the necessary software is collected.
With
emphasis on performing the following steps: - Determine
versions of DB2, WebSphere Application Server, IBM HTTP Server and IBM Tivoli
License @Manager V2.1 software required
- Determine method of obtaining
the software
- Obtain software
- Given that the patch
source is available, obtain the appropriate DB2, WebSphere Application Server
(WAS), IBM HTTP Server (IHS) and IBM Tivoli License Manager (ITLM) patches so
that all the necessary patches are collected.
With emphasis on
performing the following steps: - Determine patches required
for DB2, WAS, IHS, and ITLM
- Determine method of obtaining DB2, WAS,
IHS, ITLM patches
- Obtain DB2, WAS, IHS, ITLM patches
- Given the Architecture/Design Document, study and analyze it to determine
the physical and logical layout and the client environment so that an
assessment can be made.
With emphasis on performing the following
steps: - Study the Architecture/Design Document
- Analyze physical layout
- Analyze logical layout
- Analyze client environment
- Make the Architecture/Design
Document assessment
- Given an assessment, determine the
deployment resources and migration methods, coordinate the deployment and
migration schedules with the client IT staff, and then document everything so
that a Deployment/Migration Plan is created.
With emphasis on
performing the following steps: - Determine
deployment/migration resources and methods
- Coordinate with client IT
staff
- Develop Deployment/Migration schedule
- Document
Deployment/Migration Plan
- Given the licensing contracts,
identify contracts and licenses to be used and map them to IBM Tivoli License
Manager (ITLM) parameters so that a contracts and license requirement document
is created.
With emphasis on performing the following steps: - Identify contracts to be used
- Map contracts to ITLM
parameters
- Identify product licenses to be managed
- Map
licensing requirements to ITLM parameters
Section 2 -
Installation - Given the DB2 code and
necessary administrative authority, install DB2, update it to the correct patch
level and then configure, tune the performance and verify the installation so
that the resulting DB2 instance is optimized.
With emphasis on
performing the following steps: - Install product
- Patch DB2 to required level
- Verify install
- Tune and
configure DB2
- Given the WebSphere Application Server (WAS)
and IBM HTTP Server (IHS) code and necessary administrative authority, install
WAS and IHS, update them to the correct patch level and then configure, tune
and verify the installation so that the resulting WAS and IHS instances are
optimized.
With emphasis on performing the following steps: - Install product
- Patch to required level
- Verify
install
- Tune and configure WAS
- Given the IBM Tivoli
License Manager (ITLM) code, necessary administrative authority and planning
documentation, install the ITLM Administrative and Runtime server components as
well as tune and configure them so that the ITLM servers are ready for
operation.
With emphasis on performing the following steps: - Choose install method
- Install Administrative server and
database
- Install Runtime server and database
- Register plug-in
Runtime servers
- Tune and configure ITLM
- Verify
installation
- Given a previous IBM Tivoli Licenser Manager
(ITLM) implementation and all of the necessary resources and documentation,
perform the appropriate backup, migration, deinstallation and installation
steps so that ITLM is migrated to version 2.1.
With emphasis on
performing the following steps: - Backup Administrative server
data
- Upgrade ITLM Administrative and Runtime servers and agents to
version 1.1.1
- Run the V2.1 migration tool on Administrative server
- Uninstall the previous Administrative server
- Rerun the V2.1
migration tool on Administrative server
- Install the V2.1
Administrative server
- Uninstall the previous Runtime servers
- Install the V2.1 Runtime server and plug-in
- Given
the IBM Tivoli License Manager Catalog Manager code, necessary administrative
authority and planning documentation, install and verify the Catalog Manager so
that it is ready for operation.
With emphasis on performing the
following steps: - Install Catalog Manager
- Verify
installation
- Given the latest IBM Tivoli License Manager
(ITLM) patches, install the patches and verify that the updates are successful
so that ITLM is updated.
With emphasis on performing the following
steps: - Install ITLM patches
- Verify patch
installation
Section 3 - Configuration and
Tuning - Given SSL
certificates, determine the SSL channel configuration, enable the channels,
install SSL certificates and verify the communications so that successful SSL
communications result.
With emphasis on performing the following
steps: - Determine SSL channel configuration
- Enable
SSL channels
- Install SSL certificates
- Verify SSL
communications
- Given IBM Tivoli License Manager (ITLM)
databases, determine the backup scope, create backup schedule, perform and
verify backups so that the DB2 databases are successfully backed up.
With emphasis on performing the following steps: - Determine
backup scope
- Create backup schedule
- Perform the backups
- Verify the backups
- Given a list of administrators,
their roles and privacy policies, create an account, define roles and privacy
policies and determine and set authentication methods so that the administrator
accounts are defined.
With emphasis on performing the following
steps: - Create account
- Define role and privacy
policy
- Determine and set authentication method
- Given the Architecture/Design Document, create the required
organizations, divisions and users to complete the documented topology.
With emphasis on performing the following steps: - Create additional organizations
- Create divisions
- Add
users
- Given the latest version of the IBM catalog, import
the catalog while accounting for any previous customizations so that the
catalog is updated while preserving customizations.
With emphasis on
performing the following steps: - Download the latest IBM
catalog
- If migrating, verify customizations
- Import catalog
- Validate customizations
- Given the planning
documentation and deployment method, schedule with the client IT staff to
prepare and deploy agents so that they are successfully deployed and plugged
in.
With emphasis on performing the following steps: - Prepare deployment method
- Coordinate with client IT staff
- Deploy according to the schedule
- Track deployment
status
- Given a list of agents, choose a method and update
the agents based on a determined schedule to ensure that the agents are updated
correctly.
With emphasis on performing the following steps: - Determine agent update method
- Determine agent update
schedule
- Update agents
- Verify update
- Given
agents and divisions, the scanning scope and schedule, implement the scan so
that the software scans are successfully scheduled.
With emphasis on
performing the following steps: - Determine scope of the scans
- Determine the schedule
- Set the schedule
- Verify the
schedule
- Given a list of products, executables and
modifications, use the Catalog Manager to create or modify modules and products
and set the scope for usage monitoring and recognition so that the catalog is
customized accordingly.
With emphasis on performing the following
steps: - Launch Catalog Manager
- Create/update modules
and products
- Set the scope for module/product usage monitoring and
recognition
- Given the contract and license requirements
document, select the necessary custom fields and enter the contract information
so that the contracts are created.
With emphasis on performing the
following steps: - Select needed custom fields
- Enter
contract information
- Given the contract and license
requirements document, select the necessary custom fields, enter the license
information, associate to contract and distribute the licenses so that the
licenses are created and effective.
With emphasis on performing the
following steps: - Select custom fields
- Enter license
information
- Distribute licenses
- Given a contract
and licensing requirements document, create the monitoring definitions so that
the customer can keep track of and enforce the use of the required products.
With emphasis on performing the following steps: - Select product
- Define monitoring
- Given a
fully installed and configured IBM Tivoli License Manager (ITLM) environment,
use performance analysis tools to make the necessary adjustments on the servers
to create an optimally tuned system.
With emphasis on performing the
following steps: - Use performance analysis tools
- Identify necessary adjustments to performance
- Make necessary
performance adjustments
- Given a configured IBM Tivoli Data
Warehouse (ITDW) server, install, configure and verify the IBM Tivoli License
Manager (ITLM) Warehouse Enablement Pack so that it is integrated with ITDW.
With emphasis on performing the following steps: - Install and configure Warehouse Enablement Pack
- Verify
connection
- Verify Crystal Reports
- Given a working
and populated IBM Tivoli License Manager (ITLM) Administrative server, select
the various reports and configure the reporting parameters to create the final
report which can optionally be exported.
With emphasis on performing
the following steps: - Select report type
- Configure
report parameters
- Run the report
- Export the
report
Section 4 - Troubleshooting - Given an
operational problem in the IBM Tivoli License Manager (ITLM) environment, make
use of the log files and associated tools to make a problem determination.
With emphasis on performing the following steps: - Locate log files
- Use PD tools to prepare logs
- Check
log files for problems
- Given a problem in the environment
that cannot be determined by the standard logs or trace logs, make use of the
various tracing tools to identify the problem.
With emphasis on
performing the following steps: - Determine trace levels
- Set trace levels
- Activate tracing via restarting or relogging
- Recreate problem situation
- Check traces for
problems
- Given that a problem has been isolated to a
configuration issue, make the necessary configuration file adjustments and
activate them so that the problem is resolved.
With emphasis on
performing the following steps: - Locate appropriate
configuration file
- Check configuration settings for problems
- Modify configuration settings
- Restart component
- Given a failed or corrupted component of an IBM Tivoli License Manager
(ITLM) system, restore or recover the necessary components to restore the
system to a usable state.
With emphasis on performing the following
steps: - Identify system to recover
- Manage outage
- Recover data or configuration
- Bring system back
online
- Given an installed IBM Tivoli License Manager (ITLM)
system, uninstall all of the components of the system to effectively remove
ITLM from the environment.
With emphasis on performing the following
steps: - Uninstall agent
- Uninstall Runtime server
- Uninstall Catalog Manager
- Uninstall Administrative
server
|